T1 Extension over fiber

This project was for TFC-BJC Campus. Following you will find the Scope of Work, system block, and materials needed for the project.

Scope of Work :
Coming from STL05
  1. 3 T1s for CDMA from Clayton Ave will be extended to Kingshighway
  2. 1 T1 for iDEN from Clayton Ave will be extended to Kingshighway
  3. A total of 4 T1s will be extended from CAB Datacenter to Shoenberg Datacenter
  4. For 4 T1s we will need 2 strands of  Single Mode Fiber with ST connectors. With 4 more strands of redundant fiber, we will need a total of 6 strands of  Single Mode Fiber with ST connectors.
Coming from STL01
  1. 3 T1s for CDMA from Kingshighway will be extended to Clayton Ave
  2. 1 T1 for iDEN from Kingshighway will be extended to Clayton Ave
  3. A total of 4 T1s will be extended from Shoenberg Datacenter to CAB Datacenter
  4. For 4 T1s we will need 2 strands of  Single Mode Fiber with ST connectors. With 4 more strands of redundant fiber, we will need a total of 6 strands of  Single Mode Fiber with ST connectors.
Therefore, we will need a total of 12 strands of SMF with ST connectors running between CAB and Shoenberg datacenters for the T1 Extension Project at TFC-BJC.  Fibers will be terminated at each location at fiber patch panel and then fiber jumpers will be installed between the patch panel and MUX housing.

Fiber run between the datacenters, patch panels, all other related materials will be provided by TFC.

Block Diagram:

Materials Needed:
  1. T1 4X1 MUX CO CARD SINGLEMODE ST W/ RJ48C (Mfr Part No: 8806-1385-01RJ) = Quantity (2)
  2. T1 4X1 MUX SUB CARD SINGLEMODE ST W/ RJ48C (Mfr Part No: 8806-1395-01RJ) = Quantity (2)
  3. 4 CARD SHELF HOUSING W/ 48VDCPOWER SUPPLY (Mfr Part No: 8806-1231-03A48) = Quantity (2)
  4. 48VDC 1.2AH BATTERY PACK, WALL MOUNT (Mfr Part No: 8806-1204-01BB) = Quantity (2)